The Network Rail (Cambridge Re-Signalling) Order 2024
This Order confers powers on Network Rail Infrastructure Limited to acquire compulsorily land, and rights over land, and to use land temporarily in connection with the works required for the re-signalling of the Cambridge station interlocking area and the upgrade of the relevant level crossings, including any other works and operations incidental or ancillary to such works.
Lifecycle
Department
Made
23 May 2024
—
In force
13 Jun 2024
Enabling power
The Secretary of State in exercise of the powers conferred by sections 1 and 5 of, and paragraphs 3, 4, 7, 8, 11 and 16 of Schedule 1 to, the 1992 Act makes the following Order.
DocumentsOpen on legislation.gov.uk →