This Order confers powers on Network Rail to close or downgrade the level crossings specified in articles 15 and 28, Schedule 2 and Schedule 4 and for the temporary use of land in connection with the construction of public rights of way and other works in the highway where these are required in connection with the level crossing changes.
Lifecycle
Department
Made
10 Dec 2020
—
In force
31 Dec 2020
Enabling power
The Secretary of State, in exercise of the powers conferred by sections 1 and 5 of, and paragraphs 2 to 5, 7, 8, 10, 11 and 16 of Schedule 1 to, the 1992 Act makes the following Order—