BrowseStatutory InstrumentsSI 2023/523
SIin_forceSI 2023/523 · order

The Network Rail (Essex and Others Level Crossing Reduction) (Amendment) Order 2023

This Order amends the Network Rail (Essex and Others Level Crossing Reduction) Order 2022 which conferred powers on Network Rail to close or downgrade the level crossings specified in Schedule 2 and for the permanent acquisition of and temporary use of land in connection with the construction of public rights of way and other works in the highway required in connection with the level crossing changes. This Order clarifies the extent of stopping up of Footpath EX/213/24 (Boreham) (Schedule 2) and removes Plot 32 from Schedule 5 which is no longer needed for access.

Sign in to trackLast fetched 30 Apr 2026 · legislation.gov.uk
Lifecycle
Department
Made
10 May 2023
In force
11 May 2023