BrowseStatutory InstrumentsSI 2020/1485
SIin_forceSI 2020/1485 · order

The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020

This Order confers powers on Network Rail to close or downgrade the level crossings specified in articles 15 and 28, Schedule 2 and Schedule 4 and for the temporary use of land in connection with the construction of public rights of way and other works in the highway where these are required in connection with the level crossing changes.

Sign in to trackLast fetched 30 Apr 2026 · legislation.gov.uk
Lifecycle
Department
Made
10 Dec 2020
In force
31 Dec 2020