The Network Rail (Essex and Others Level Crossing Reduction) Order 2022
This Order confers powers on Network Rail to close or downgrade the level crossings specified in Schedule 2 and for the permanent acquisition of and temporary use of land in connection with the construction of public rights of way and other works in the highway required in connection with the level crossing changes.
Lifecycle
Department
Made
09 Jun 2022
—
In force
30 Jun 2022
Enabling power
The Secretary of State, in exercise of the powers conferred by sections 1 and 5 of, and paragraphs 2 to 5, 7, 8, 10, 11 and 16 of Schedule 1 to, the 1992 Act makes the following Order—
DocumentsOpen on legislation.gov.uk →