This Order confers powers on Network Rail to stop up the level crossings specified in Schedule 5 and for the acquisition and temporary use of land in connection with the construction and maintenance of a public highway and a footbridge where these are provided to replace the crossings. It also authorises the acquisition of land for the provision of railway infrastructure for which Network Rail has permitted development rights.