BrowseStatutory InstrumentsSI 2024/724
SIin_forceSI 2024/724 · order

The Network Rail (Cambridge Re-Signalling) Order 2024

This Order confers powers on Network Rail Infrastructure Limited to acquire compulsorily land, and rights over land, and to use land temporarily in connection with the works required for the re-signalling of the Cambridge station interlocking area and the upgrade of the relevant level crossings, including any other works and operations incidental or ancillary to such works.

Sign in to trackLast fetched 30 Apr 2026 · legislation.gov.uk
Lifecycle
Department
Made
23 May 2024
In force
13 Jun 2024