HS2 Phase 2b design refinement consultation

Seeks views on proposed refinements to the Phase 2b (Crewe to Manchester and West Midlands to Leeds) line of route.

Last fetched 03 May 2026 · gov.uk
Detail
Background information

The Secretary of State for Transport is consulting on 11 proposed design refinements to the HS2 Phase 2b route. This design refinement consultation (DRC) is a key milestone on the path leading up to hybrid bill deposit.

HS2 Phase 2b design refinement consultation: introduction

The development of a major engineering project such as HS2 involves a series of design refinements right up until the point of construction. When refining the design, HS2 Ltd looks to make improvements, where possible, on environmental, technical, service and cost aspects of the scheme.

This consultation asks for views, based on the information included in the ‘Design refinement consultation’ document, which will be independently analysed and reported, and then considered by the Secretary of State when making his decision about the final route.

Responses to the consultation will be considered as the design and environmental statement are finalised for deposit in Parliament as part of the hybrid bill.

Documents
HS2 Phase 2b design refinement consultation document (web version)application/pdfHS2 Phase 2b design refinement consultation document (print version)application/pdfHS2 Phase 2b design refinement: visualisations and plan and profile mapsapplication/pdfPhase 2b DRC plans and profiles: Relocation of the Palatine Road vent shaftapplication/pdfPhase 2b DRC plan: Relocation of the Palatine Road vent shaftapplication/pdfPhase 2b DRC visualisation: Relocation of the Palatine Road vent shaft, West Didsbury, Manchesterapplication/pdfPhase 2b DRC visualisation: Relocation of the Palatine Road vent shaft, West Didsbury, Manchesterapplication/pdfPhase 2b DRC plans and profiles: Relocation of the Lytham Road vent shaft to Birchfields Roadapplication/pdfPhase 2b DRC visualisation: Relocation of the Lytham Road vent shaft to Birchfields Road, Fallowfield, Manchesterapplication/pdfPhase 2b DRC plans and profiles: Realignment of the route at Junction 10 of the M42application/pdfPhase 2b DRC visualisation: Realignment of the route at junction 10 of the M42, North Warwickshireapplication/pdfPhase 2b DRC visualisation: Realignment of the route at junction 10 of the M42, North Warwickshireapplication/pdfPhase 2b DRC plans and profiles: Realignment of the route between Ashby-de-la-Zouch and Diseworthapplication/pdfPhase 2b DRC visualisation: Realignment of the route between Ashby-de-la-Zouch and Diseworth, Leicestershireapplication/pdfPhase 2b DRC visualisation: Realignment of the route between Ashby-de-la-Zouch and Diseworth, Leicestershire application/pdfPhase 2b DRC visualisation: Realignment of the route between Ashby-de-la-Zouch and Diseworth, Leicestershire application/pdfPhase 2b DRC plans and profiles: Realignment of the route at Trowell to avoid the M1application/pdfPhase 2b DRC visualisation: Realignment of the route at Trowell in Nottinghamshire to avoid the M1application/pdfPhase 2b DRC plans and profiles: Leeds Corridor, Woodlesford to Leeds Stationapplication/pdfPhase 2b DRC visualisation: Leeds corridor, Woodlesford to Leeds stationapplication/pdfPhase 2b DRC plans and profiles: Maintenance facility at Ashleyapplication/pdfPhase 2b DRC visualisation: Temporary construction railhead and permanent maintenance facility near Ashley, Cheshireapplication/pdfPhase 2b DRC plans and profiles: Maintenance facility at Austreyapplication/pdfPhase 2b DRC visualisation: Permanent maintenance facility at Austrey, North Warwickshireapplication/pdfPhase 2b DRC visualisation: Permanent maintenance facility at Austrey, North Warwickshireapplication/pdfPhase 2b DRC visualisation: Temporary construction railhead at Ashby-de-la-Zouch, Leicestershireapplication/pdfPhase 2b DRC visualisation: Temporary construction railhead at Ashby-de-la-Zouch, Leicestershireapplication/pdfPhase 2b DRC visualisation: Permanent train stabling facility at Heaton, Newcastle upon Tyneapplication/pdfPhase 2b DRC plans and profiles: Passive provision for 2 junctions at High Legh, Cheshireapplication/pdfPhase 2b DRC visualisation: Passive provision for 2 junctions at High Legh, Cheshireapplication/pdfPhase 2b DRC visualisation: Passive provision for 2 junctions at High Legh, Cheshireapplication/pdfPhase 2b DRC visualisation: Passive provision for 2 junctions at High Legh, Cheshireapplication/pdfPhase 2b DRC visualisation: Passive provision for 2 junctions at High Legh, Cheshireapplication/pdfHS2 Phase 2b design refinement consultation outcome (Web version)application/pdfHS2 Phase 2b design refinement consultation outcome (Print version)application/pdfHS2 Phase 2b design refinement consultation summary reportapplication/pdf