BrowseConsultations
CONSULT.Outcome publishedConsultation · gov.uk

Appropriate measures for permitted facilities that take chemical waste

We want your comments on our proposed guidance for appropriate measures for permitted facilities that take chemical waste.

Last fetched 03 May 2026 · gov.uk
Detail

Appropriate measures for permitted facilities that take chemical waste for treatment or transfer are set out in technical guidance note EPR 5.06: recovery and disposal of hazardous and non-hazardous waste.

This consultation is for our new proposed guidance on appropriate measures for permitted facilities that take chemical waste which will replace the technical guidance note.

The guidance aims to:

  • improve the design and operation of permitted facilities in the chemical waste sector
  • ensure that appropriate measures are applied consistently, where relevant

It will also incorporate the relevant requirements of the waste treatment best available techniques conclusions publication made under the European Industrial Emission Directive (2010/75/EU). This applies to waste installation facilities permitted under the Directive.

Documents