The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017

This Order confers powers on Network Rail to stop up the Abbots Ripton level crossing and to construct works in connection with the closure of the level crossing, the extinguishment of the existing right of way and the creation of alternative public rights of way. The Order further confers powers on Network Rail for the temporary use of land in connection with the construction of the public rights of way provided to replace the crossing.

Sign in to trackLast fetched 30 Apr 2026 · legislation.gov.uk
Lifecycle
Department
Made
17 Nov 2017
In force
08 Dec 2017