This instrument confirms a Scheme to construct over the navigable waters of the River Wear the Footbridge specified in the Schedule to this Scheme required as part of the development of the Riverside and which is required to connect pedestrian and cycleway purposes only the Vaux Site and the Sheepfolds area situated in the city centre of Sunderland.