The Reading Borough Council (River Thames Reading Pedestrian/Cycle Bridge) Scheme 2013 Confirmation Instrument 2014
This instrument confirms a scheme to construct over the navigable waters of the River Thames the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct/improve between the South Bank of the Thames, Reading, directly to the South of Fry’s Island, Reading RG1 and the North Bank of the Thames in the vicinity of Christchurch Meadows, Reading, to the East and North of Fry’s Island in the Borough of Reading in the said County.
Lifecycle
Department
Made
24 Jun 2014
—
Comes into force
TBC
Enabling power
The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980and now vested in the Secretary of State:
DocumentsOpen on legislation.gov.uk →