The Network Rail (Ferryboat Lane Footbridge Reconstruction) (Land Acquisition) Order 2021
This Order confers powers on Network Rail to acquire compulsorily land required in connection with the construction and maintenance of a new, ramped footbridge over the Penistone to Doncaster railway (Network Rail Engineer’s Line Reference PED5) at Mexborough, referred to in this Order as the “development”. The development has separately been authorised by a grant of planning permission under Part 3 of the Town and Country Planning Act 1990 (c. 8) from Doncaster Metropolitan Borough Council. The Order also confers powers on Network Rail to take temporary possession of land in connection with the development and to use land, and the airspace above the surface of land, temporarily to oversail cranes and for construction access.
Lifecycle
Department
Made
11 Mar 2021
—
In force
01 Apr 2021
Enabling power
The Secretary of State, in exercise of the powers conferred by sections 1 and 5 of, and paragraphs 3, 4, 7, 8, 11 and 16 of Schedule 1 to, the 1992 Act, makes the following Order—
DocumentsOpen on legislation.gov.uk →