The National Framework for the Commissioning of Care and Support in Wales Code of Practice and the Revised Code of Practice (General Functions) (Appointed Day) (Wales) Order 2024
This Order appoints 1 September 2024 as the day on which the Codes of Practice listed in article 2 of this Order (“the Codes”) come into force.
Sign in to trackLast fetched 03 May 2026 · legislation.gov.uk
Lifecycle
Department
Made
27 Aug 2024
—
Comes into force
TBC
Enabling power
In accordance with section 146(3) of the 2014 Act, within a period of 40 days Senedd Cymru did not resolve not to approve the draft Codes, and the Codes were issued in the form of the draft.
DocumentsOpen on legislation.gov.uk →