The M48 Motorway (Severn Bridge Speed) (Temporary Restriction of Traffic) Order 2022
This Order authorises the temporary restriction of traffic on the M48 Motorway (Severn Bridge) as of 27th June 2022 for a maximum of 18 months because works are proposed to be carried out.
Lifecycle
Department
Made
23 Jun 2022
—
In force
27 Jun 2022
Enabling power
In accordance with section 14(1)(a) of that Act, the Secretary of State is satisfied that traffic on the length of road specified in this Order should be restricted because works are proposed to be executed on the M48.