The M25 Motorway (Junctions 27 to 30) (Variable Speed Limits) Regulations 2013
These Regulations introduce variable speed limits to the M25 Motorway from junctions 27 to 30 and on associated slip roads and linking carriageways.
Lifecycle
Department
Made
11 Dec 2013
—
In force
20 Jan 2014
Enabling power
Representative organisations have been consulted in accordance with section 134(2) of that Act.
DocumentsOpen on legislation.gov.uk →