The London Luton Airport Passenger Transit System Order 2021
This Order ensures that the mass passenger transit system linking Luton Airport Parkway railway station and the central terminal at London Luton Airport, as constructed by London Luton Airport Limited (referred to in this Order as LLAL), operates effectively. The Order makes provision in connection with the operation of the passenger transit system, provides for fares to be charged for use of the passenger transit system and for the issue of penalty fares and gives effect to byelaws which regulate travel on the passenger transit system.
Lifecycle
Department
Made
26 Jul 2021
—
In force
16 Aug 2021
Enabling power
The Secretary of State, in exercise of the powers conferred by sections 1 and 5 of, and paragraphs 1, 8, 9, 12, 13, 15 and 17 of Schedule 1 to, the 1992 Act, makes the following Order—
DocumentsOpen on legislation.gov.uk →