ORDERPAPER
Today
Browse
Your MP
The Drax Power (Generating Stations)… · Order Paper · Order Paper
Browse
Statutory Instruments
SI 2020/879
SI
pending
SI 2020/879
The Drax Power (Generating Stations) (Correction) Order 2020
Sign in to track
Last fetched 30 Apr 2026 · legislation.gov.uk
This SI is published as a PDF only.
legislation.gov.uk hasn't transcribed the text — sponsoring department, made date, and procedure type aren't in the index. Open the original document below for the full content.
Open PDF
Lifecycle
Department
Made
TBC
—
Comes into force
TBC
Documents
Open on legislation.gov.uk →
Instrument
Instrument
application/pdf
· 20 Aug 2020
· 33 KB
Related SIs
SI
The Drax Power (Generating Stations) Order 2019
SI
The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024
SI
The Millbrook Gas Fired Generating Station (Amendment) Order 2020