BrowseStatutory InstrumentsSI 2014/2594
SIin_forceSI 2014/2594 · order

The Burbo Bank Extension Offshore Wind Farm Order 2014

This Order grants development consent for, and authorises DONG Energy Burbo Extension (UK) Limited to construct, operate and maintain a generating station in the sea approximately 7 kilometres off the north Wirral coast, 8.5 kilometres from Crosby beach and 12.2 kilometres off the coast of Point of Ayr, Wales, being an extension to the existing Burbo Bank offshore wind farm located on the bed of Liverpool Bay, together with all necessary and associated development. The Order imposes requirements in connection with the development for which it grants development consent.

Sign in to trackLast fetched 30 Apr 2026 · legislation.gov.uk
Lifecycle
Department
Made
25 Sept 2014
In force
26 Sept 2014