The Net Zero Teesside Order 2024

This Order authorises Net Zero Teesside Power Limited and Net Zero North Sea Storage Limited (together referred to in this Order as the undertaker) to construct, operate and maintain a gas-fired electricity generating station with an electrical output of up to 860 megawatts together with equipment required for the capture and compression of carbon dioxide emissions from both the generating station and a wider industrial carbon capture network in Teesside. The Order also authorises the undertaker to construct, operate and maintain infrastructure for the high-pressure compression of carbon dioxide and the landward part of an offshore carbon dioxide export pipeline. The Order would permit the undertaker to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.

Sign in to trackLast fetched 30 Apr 2026 · legislation.gov.uk
Lifecycle
Department
Made
16 Feb 2024
In force
11 Mar 2024