Correction Slip
This Order confers powers on Network Rail to construct a pedestrian footbridge over the West Anglia Main Line railway lines in the vicinity of Northumberland Park station in the London Borough of Haringey, to close the Northumberland Park level crossing and to stop up the public right of way over the existing stepped footbridge adjacent to that level crossing. The Order provides for the creation of a new public right of way for pedestrians over the new footbridge.
Sign in to trackLast fetched 30 Apr 2026 · legislation.gov.uk
Lifecycle
Department
Made
23 Feb 2017
—
In force
16 Mar 2017
Enabling power
The Secretary of State, in exercise of the powers conferred by sections 1 and 5 of, and paragraphs 1, 2, 4, 7, 8, 11 and 16 of Schedule 1 to the 1992 Act makes the following Order:—
DocumentsOpen on legislation.gov.uk →