I beg to move,
That this House has considered Restoration and Renewal.
The Palace of Westminster is a magnificent building, which must be saved for future generations. Charles Barry and Augustus Pugin’s creation is a triumph of neo-Gothic architecture, recognised the world over. Within these walls, our history, architecture and politics are entwined together. It is a place that inspires us as politicians, just as it inspires the many schoolchildren who visit Westminster. On the Palace walls, the history of their nation is writ large: from the exploits of King Alfred to the stonework damaged by Nazi bombs, left unrepaired as a reminder that this House stood firm against tyranny; from the great Tudor portraits in the Prince’s Gallery to representations of both sides of the civil war, and to the great statesmen—Walpole, Pitt, Burke —who graced St Stephen’s with their rhetoric.
Then we have Westminster Hall—a space that has been at the heart of our national life for nearly a millennium. Built by William Rufus, its hammer-beam roof completed by Richard II, it was the one part of the building that the firemen fought to save as the rest of the Palace succumbed to the flames in 1834. There were the trials of Thomas More, Thomas Wentworth, Charles I—so many great events took place in Westminster Hall. It was the centre of justice and the seat of wisdom for centuries. I want the children and grandchildren of the 1 million pupils who have visited us in recent years to be able to come here and learn about their nation’s history. I want them to be as inspired as I was when I first visited here as a child and won a prize—a biro—for knowing more parliamentary facts than any of my fellow pupils at that time.
The prize we are now seeking is the Palace of Westminster itself. This is a building that must remain part of our national heritage for centuries to come, but it is also a building which, if we fail to act, risks being lost to history forever. Over the years, the Palace has become an increasingly complex and flawed proposition for those tasked with its preservation. Like the barnacled encrustations on the hull of a noble ship, layer upon layer of incremental changes have been built up over the years, just as the challenges of managing an ageing building have built up, too.
Since 2017, over 40,000 problems have been reported and the Palace is now deteriorating faster than it can be repaired. Anyone who ventures into the basement will see for themselves why. Steam pipes run alongside electric cables. Hundreds of miles of cabling are now in need of replacement. A sewage ejector, installed in 1888, is still in use today. In short, there is a meandering multiplicity of multifarious materials all in need of urgent attention and all increasing the vulnerability of the building. Those who want to know what 150 years of patch and mend looks like are advised to descend into the depths of the Palace and see for themselves.
When I returned to the basement yesterday, I was pleased to find a newly installed system, which will fill the space with a fine mist in the event of a fire. That is among the remedial but temporary measures put in place in recent years to address the possibility that the building might be imperilled by a serious blaze. I am advised that steps such as extra emergency lighting, the installation of new alarms, day and night fire patrols and so on ensure that life will be safe. What cannot be guaranteed is that our historic palace can be saved from destruction in the event of a serious fire. We have known for a long time that, if a blaze were to take hold, the lack of compartmentation would endanger the entire building, so it is a matter of some frustration that comprehensive fire safety alterations have not begun because we have been waiting for the main R&R programme.
Fortunately, we are now moving towards the historic moment when this House is asked to approve a motion allowing the works to commence in the mid-2020s as planned. Such a decision, involving billions of pounds of public funds, taxpayers’ money, which would ideally be spent elsewhere, cannot be taken on a whim, so three requirements must be met if the restoration and renewal programme is to command the confidence of the House and of taxpayers. First, the proposal must be robust and evidence-based; secondly, it must give value for money and we must cut out unnecessary spending; and thirdly, the plans need to be up to date.
No one here today will forget for a moment that we are discussing this matter in the midst of a global pandemic, which is placing great strain on the nation’s purse strings. Today’s debate is a chance to set out our expectations in this context, and this should be a limited project to replace failing mechanical and engineering equipment, not an opportunity to create a second Versailles.
The debate also gives us an opportunity to note how far we have come since Deloitte produced its independent options appraisal in 2015. The Joint Committee’s report of September 2016 was followed by the motion of January 2018, which led in turn to the passage of the Parliamentary Buildings (Restoration and Renewal) Act 2019. This legislation addressed the first of our three requirements—that the proposals must be robust and evidence-based—by adopting the governance structures used to deliver major infrastructure projects such as the 2012 Olympic games. The Sponsor Body will act as the client on behalf of Parliament and oversee the delivery of the works, which will be entrusted to a Delivery Authority equipped with the expertise needed to keep costs down and to manage a project of this complexity.
The Delivery Authority is already showing the value of its professionalism by getting on with the basics, undertaking detailed investigations of the palace’s condition. Once these surveys are completed, it will then move on to preparing detailed proposals in the form of an outline business case. There can be no blank cheque for this work, which is why it is so important that the outline business case will be fully costed. This will be the first time that we have had a proposition that we can assess in value-for-money terms, which is the second essential requirement before Members are asked to make their decision. Rather than hurrying along in an over-hasty fashion—[Laughter.] I am glad that I am creating such hilarity on such a serious subject. It is crucial that we take the time and accept the expense required to get this right—the right price to pay for the assurances we need that the project will be delivered on time and on budget.