I beg to move,
That this House has considered rail services for Maidenhead, Twyford and linking branch lines.
I am pleased to have obtained this debate, because the train services in my constituency—for the mainline stations of Maidenhead and Twyford, and the branch line stations of Wargrave, Furze Platt and Cookham—are absolutely critical for my constituents and local businesses. Many of my constituents use the train services to access employment, particularly in London, which they also visit for leisure—visiting theatres and galleries and going shopping—and for other purposes. Local businesses also rely on the train services to bring potential customers, employees and other visitors. They all want fast train services on those lines.
I have campaigned on this issue throughout my time as a Member of Parliament. The good news is that, over that time, Thames Trains and its successor, Great Western Railway, under its various names, have generally been responsive to the concerns that have been raised about services in the constituency. When there have been problems with the timetable, they have done their best to respond.
The bad news, I am afraid, is that I cannot set out that rosy picture today, because the service has deteriorated. Nick Brace, a constituent of mine, said that the most frustrating thing is that
“for much of 2019 GWR had this all sorted—the right number of trains, in the right format mostly running to time. And it has all gone down the pan with the new timetable.”
The key issue is not the timetable, but the reason behind it: the introduction of Crossrail.
Before I address that, I will set out clearly for the Minister the nature of the problems that my constituents currently face: fewer fast trains, less reliability and significant overcrowding. Great Western fast trains have been cut from the timetable during the morning and evening peak hours to provide more long-distance services, which has had a significant impact on my constituents.
I will share some examples of the complaints I have received from constituents. One said:
“Morning and evening rush hour fast trains to/from Paddington have been massively reduced. For example we have gone from fast trains at 8.02, 8.06, 8.16 and 8.32 to only two—8.02 and 8.32. The intervening trains have now become 35 minute trains, which means London commuters don’t use them.”
Another said:
“Under the original timetable between the times of 07.40 and 08.30, there are three trains…that take 30 minutes or less to Paddington. From December 15th, there will be just one fast train within this time period—the 08.02. The fast train before that will be 27 minutes earlier, leading to a huge bottleneck of commuters.”
On the evening services, a constituent said:
“Most crucially is the cancellation of the two peak evening fast trains to London Paddington. These two peak trains—the first a 4.42pm and the second at 5.48pm—take approximately 21 minutes and represent a significant difference from the 39 to 47 minutes being introduced as part of the new timetable.”
Great Western Railway has looked at reinstating the two peak-hour morning services that were removed, but sadly it has told me that
“there is no readily available space for additional stops”
but that it has
“looked at a number of options including sourcing extra rolling stock and stopping high speed services that have originated in the west, such as from Bristol or Plymouth. Disappointingly, it has not been possible to find a timetable path that will work without causing congestion and significant performance delays in the key peak period.”
On the evening services, GWR told me on 30 January that it was
“in discussion with Network Rail about the possibility of introducing some additional evening services from Maidenhead to London Paddington, which we might be able to operate from May, or sooner if we can gain approval.”
At that stage, it continued:
“It is fair to say that NR are apprehensive about the performance ramifications of these trains”.
I can now tell the Minister that this week Network Rail refused the application for those additional services.
I have been here before. Network Rail has previously refused additional services and changes to the timetable but then relented. Great Western Railway will appeal against that rejection, and I will appeal, but I urge Network Rail to reconsider and to reinstate those two trains. That matters not just for my constituents, but for our local economy, the wider Thames valley economy and the economy of the nation as a whole.