My Lords, the extension to Article 50 requires changes to legislation made earlier this year to ensure continued confidence in our consumer safety system. This statutory instrument will amend three earlier regulations: first, a number of product schedules in the Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019, made in March 2019; secondly, the Pressure Equipment (Safety) Regulations 2016; and, thirdly, the Conformity Assessment (Mutual Recognition Agreements) Regulations 2019. I will now take noble Lords through the detail of the changes made to each of these regulations—I can see the excitement building.
The change in exit day has created ambiguity for the personal protective equipment industry, necessitating revision to the Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019. The opportunity has also been taken to refine the instrument based on stakeholder feedback and ongoing developments in the sector, notably clarifying the continued use of data from pre-March 2013 as it affects cosmetics and ensuring that the UK will be able to update the lists of prohibited or restricted substances in all circumstances going forward.
I am concerned that, following publication of the main product safety instrument, stakeholders drew to our attention a number of these issues. I wish to apologise that these errors were identified by stakeholders after our own internal scrutiny processes had been cleared. Once alerted to these issues, we held meetings with the representative bodies from across the product areas to discuss the drafting errors identified and review the relevant product schedule for any other potential points that might require clarification. Eight meetings were held and a number of phone calls and emails were exchanged with relevant stakeholders. We have sought to do all we can in this regard to catch any issues that might not have been caught in the first instance.
Consequently, minor amendments regarding outdoor noise, recreational craft, toys, electromagnetic compatibility, electrical equipment, radio equipment, simple pressure vessels, machinery, measuring instruments and accreditation will be made. We will also correct the error whereby pressure equipment manufacturers would have been deprived of the option of having their manufacturing processes of base materials certified by a competent body.
Details of the technical changes are included in paragraph 7 of the published Explanatory Memorandum. These could ordinarily have been addressed through guidance. However, the extension to exit day meant that we were required to make an instrument to address specific exit-related issues, and we decided that it would be good practice at the same time to bring these minor changes into legislation to give full clarity for business.
We have also taken the opportunity to update the Pressure Equipment (Safety) Regulations 2016 to ensure full implementation of the importer labelling requirements to make it clear that an importer must put their information on both pressure equipment and assemblies. Post exit, UK importers in some circumstances will be able to put their details on a document accompanying the equipment or the assembly.