To ask His Majesty’s Government what steps they plan to take to ensure the continued development of the offshore wind industry following the failure to attract bids in the latest Contracts for Difference round.
My Lords, the Government are disappointed that no offshore or floating offshore wind projects secured contracts for difference in the most recent allocation round. The results provide valuable learning for subsequent auctions. Work has already started on allocation round 6, incorporating the results of the recent round, and we look forward to a strong pipeline of technologies participating. The Government remain fully committed to our target of decarbonising the power system by 2035 and to our ambitions for 50 gigawatts of offshore wind, including up to 5 gigawatts of floating wind.
I thank the Minister for his Answer, but can we really wait? Look at what has happened in other countries: for example, Germany had a similar experience in December then, in the subsequent two quarters, lifted its price cap and increased its number of bids by several times. In the US, Massachusetts had a failure and New York is now considering petitions to offer a higher price. This is the low-cost, low-carbon alternative: the industry is now suggesting that there is a 24-gigawatt gap for the 2030 target. Surely the Government should be taking immediate action in the shorter term to fix this problem of their own creation, given that this was widely predicted to happen before the contracts closed.
I am happy to hear the noble Baroness be so cavalier with bill payers’ funds; she is, in effect, talking about increasing the strike price. It is always difficult for the Government to strike the right balance: we want to get the best value possible for bill payers, as opposed to providing sufficient revenue for the companies to build. I obviously know which side the noble Baroness is on but I want to be on the side of the bill payer. We have already secured the largest offshore wind sector in Europe by far; she quotes the example of Germany, which should be very jealous of the amount of offshore wind capacity that we have. We secured almost 7 gigawatts in the last allocation round and, in this round, secured 91 projects with other technologies. There is a viable long-term pipeline of about 77 gigawatts of wind available to this Government and we will take advantage of it, but we will make sure that we do it at the right price for consumers.
My Lords, I am on the side of bill payers. The problem is that they will have to pay more, because we will not have the renewable energy that we would have had and will have to use more expensive gas instead. This was the Government’s fault; everybody warned that the reserve price was too low. But let us forget the past. Why can emergency legislation not pass through the House, which I am sure would be supported by all sides, so that we can replay this very quickly for the bill payer?
The bill payer will be very grateful that 7.5 gigawatts of construction is already under way, as we speak. We all want to see more, but at the right price. I understand why industry is urging us to pay more for this. That is understandable and in its commercial interests, but I would have expected most Members of this House to be on the side of bill payers as well. We can do both: we can get a good deal for the bill payer and take advantage of the many gigawatts of potential construction in there, which has either been consented or is under consent. Following a contract being let, it takes three to four years, on average, for the capacity to come on stream. Obviously, the capacity let in previous rounds is coming on stream gradually, as we speak. As I said, we consented to about 7.5 gigawatts in the last round. There will be another auction in about six months and it would take almost that long to pass new legislation.
My Lords, what assessment have the Government made of the increase in potential of both productivity and profitability for wind power companies to fit turbines to the base of their installations, where conditions allow, to take advantage of tidal energy, which provides a baseload. What support are the Government giving companies prepared to do that?
The noble Baroness asks a very good question. Eleven tidal stream projects were consented in this allocation round, totalling about 41 megawatts. The price for that is currently higher but we need to develop this technology. I hope, as has been the case with offshore wind, that if we continue to let more CfDs the price will continue to come down over time. That was one area of the round that was successful.
My Lords, given the Government’s monumental failure—and they were warned about it, as has been said around this House—to attract any interest whatever from the energy sector in their recent CfD bidding process for offshore wind projects, can we assume there will not be any similar complacency when it comes to developing onshore wind projects, which, in light of the current failure, must now be the Government’s priority towards achieving net zero?
Again, there is no complacency. I understand that there are many projects wanting the go-ahead, but we must be careful in making sure that the consumer gets a fair deal. Lots were consented to last year; I am sure that lots will be consented to in the future. The noble Lord talks about onshore wind. I am pleased to tell him that 24 onshore wind projects were consented to and were successful in this round, totalling 888 megawatts.
Is my noble friend aware that a number of us have taken an interest in this market, recognising the enormous steps that His Majesty’s Government have taken on the development of offshore wind? At a time when it is stated that we are facing a possible bill of £65 billion to replace the internal grid to all our homes in the United Kingdom, is it not more appropriate that the resources we do have should be used for research such as that into the mix of hydrogen with LPG to see whether it can be used in the existing pipelines available to every house in the country?
The noble Lord asks a lot of different questions within what he said. I think his figure of £65 billion refers to the cost of upgrading property to EPC level C, which is a long-term aim. His separate question on hydrogen for heating is indeed a controversial subject. We will make a decision on whether to go ahead with a hydrogen village trial by the end of the year. Similarly, another issue facing us is whether to allow blending of hydrogen into the gas network; you can blend up to about 25% with the current network. Again, that is an issue where, frankly, there are a lot of pros and cons on both sides of the argument. We will make a decision on that by the end of the year as well.
The next round comes in six months’ time. Are the Government confident that the price will be set at the right level to attract a good number of significant bids?
Of course, that will be our aim. As I said, we want to see more projects consented to and we will try to get the balance right. We will certainly learn the lessons from this round. It is obviously disappointing that we did not attract bids this time, but the offshore wind industry has been a tremendous success for the UK. We have by far the largest capacity in Europe. We have the largest offshore wind farm in the world, the second largest, the third largest and the fourth largest. One reason that developers were unable to proceed this time was pressure in the supply chain. There is pressure in the supply chain because every other country in Europe wants to copy our example, because they can see the success we have made of the offshore wind allocation rounds through the contracts for difference price system. Most other European countries are trying to adopt the same model; they are a long way behind us but trying to adopt the same model now. Of course, that brings pressure in the supply chain, which, adding in the Covid pressures as well, contributes to the increase in costs that industry is experiencing.
My Lords, is it not the case that wind-generating facilities in the North Sea tend to cause mayhem with the wild bird population? Can anything be done about that?
My noble friend certainly highlights a concern, but lots of protections are built in and lots of environmental regulations need to be adhered to when these projects are consented to and all the matters are gone into fully, in both environmental and regulatory permitting. Every energy source has its drawbacks. Those who are against nuclear would point to its drawbacks; with coal-fired power stations, there are obviously drawbacks; gas-fired power stations have their drawbacks. There has been an increase in new solar farms being developed in the UK. I can assure noble Lords that, from my postbag, lots of people write in to complain about those as well. We have to get generation capacity and electricity supplies from somewhere. No system is absolutely perfect but offshore wind is certainly one of the best.