This urgent debate is about the viability and future of Michelham Priory, a medieval, historic Sussex feature in my beautiful constituency of Wealden. First, I must place on the record my thanks to Helen Anson and Lindsay Lawrence, two superb women who manage and run Michelham Priory with their hands tied behind their backs by the Environment Agency, whose failure to maintain water flows means that the priory’s moat is now on the brink of being completely lost. The Environment Agency—yet another unaccountable, bureaucratic and faceless body that is both exploiting Michelham Priory and, as I will argue, breaching its obligations—must be held responsible not only for the environmental damage, but the financial damage to the priory, as its lack of action has the priory in absolutely dire straits.
Michelham Priory is situated on a more than 9-acre site. It is designated an ancient monument and contains a grade I listed building that became a country house in the 1930s, homing many young children as they were evacuated from war-torn Britain during the second world war. It is a unique local gem in an area of nature conservation importance, and attracts visitors from all across the country. However, it is at imminent risk of being lost forever.
Michelham Priory boasts Britain’s longest continuous medieval water-filled moat, which stretches a mile and encircles the site. It is fed by the River Cuckmere and is a crucial factor in determining the atmosphere and tranquillity of the priory, and it is a vital component for weddings and other functions taking place at the priory. However, owing to gradual silt deposition and the increasing invasive growth of aquatic plants, the moat has been deteriorating and must be desilted imminently or it will be completely lost. The site is currently run by the Sussex Archaeological Society, which has spent eight long, painful years trying to work with the Environment Agency to address the issues of sluice gates and desilting. Sadly, the Environment Agency has put hurdles in front of the society at every opportunity for eight years.
The Environment Agency is failing in its duty to operate and maintain two water-controlled structures that should let water from the River Cuckmere in and out of the priory moat. It shut the gate on the moat some 20 years ago, and has not been providing silt and water management of the River Cuckmere. That has caused the silting and drying up of the moat, as there is no significant throughflow of water. Cutting the moat off from the water supply from the River Cuckmere means that there is a total loss of water during the summer and autumn months, and currently, the only opportunity for a water supply to the moat is from continuous heavy rainfall. Subsequently, the moat has had its aquatic life decimated, which has damaged a unique natural ecosystem and caused huge regrowth of invasive vegetation.
When the Sussex Archaeological Society approached funding bodies to raise funds to save the moat and attempt to maintain its listed Historic England status, it found that potential funders needed there to be an effective plan for water management in place. Such a plan would mean that when the moat was fully desilted, people could be assured that silt deposition would not recur in the short term and undermine the charitable objectives of the grant. The Sussex Archaeological Society is more than happy to clear the silt out of the moat, but the fundamental difficulty is that unless the Environment Agency repairs its sluice gates on the moat, the problem will keep recurring. Unless the gates are repaired and fully functional, the desilter would be a waste of the £800,000 needed for silt removal. We are not asking for any funding from any agency; we want the Environment Agency to step up and do its work. Because of the reluctance of the Environment Agency to commit to repairing its sluice gates, the society cannot apply for any financial aid to clear the moat.