That is an extremely good point, and I wish that I had included it in my speech. If I have to speak about this again, I will make that point. I thank my hon. Friend and I totally agree with her.
This all became about economic development. The original purpose of easing traffic became secondary. The aims of the project changed completely, which meant that the problems at Dartford were no longer the priority—in fact, they became a secondary consideration. Then, my right hon. Friend the Member for Epsom and Ewell (Chris Grayling), the then Transport Secretary, opted for Kent and Essex’s preferred option, which will do nothing to ameliorate the situation at Dartford and will be yet another massive piece of Government spending on road infrastructure just at the moment in our history when roads are to be optimised by level 5 autonomous vehicles. The way I think of it is that if we look across the rooftops of London we see thousands of chimneys, none of them used any more. This road will end up a white elephant like them in future—and not far in the future.
First, the lower Thames crossing does not address the problems on the M25 at the Dartford crossing or provide any resilience in any way, shape or form. I will explain why. The M25 northbound at Dartford remains one of Europe’s worst traffic jams on a major national road—I imagine all hon. Members, even the Minister, can picture themselves there, having sat in those traffic jams.
The problems at the Dartford crossing are primarily caused by the outdated and undersized northbound tunnels. The southbound traffic coming over the bridge moves at pretty much the same speed as the rest of the motorway; it is not immune to traffic jams, but neither is the rest of the system. The problem is the tunnels. The left-hand one is 4.8 metres high and the right-hand one is 5 metres high. They are the cause of the horrendous jams, because no fuel tankers or hazardous loads are permitted unescorted, and no vehicles over 5 metres high are permitted at all.
What happens is that we end up with traffic, including very large vehicles, weaving and causing frequent accidents and incidents, as well as frequent red traffic lights to hold the rest of the traffic in order to extract an over-height vehicle that has managed to go through. Then, of course, a couple of times an hour all the traffic on the M25 going north is stopped, because they have to run the convoys with fuel tankers and hazardous materials in them. That causes congestion and queuing, and hardly a day goes by without a major incident bringing the M25 to a complete standstill and causing gridlock at Dartford.
The lower Thames crossing, the one to the east of Gravesend, does not address those problems at all, nor does it provide a satisfactory alternate route for M25 traffic. Let us note, by the way, that the M25 is not complete—it stops just before Dartford and becomes an A road, and then becomes the M25 again. We have not actually finished building the M25 yet.