I appreciate the right hon. Gentleman’s intervention. I agree that such sites can be in remote locations where there are fewer resources. As I will say later in my remarks, fire officer training is very much part of what I am recommending.
There is a strong case for mandating water-based suppression systems, off-gas detection, ventilation systems and thermal runaway mitigation as design conditions. Unfortunately, that is far from the case today. The guidelines for planning approval are imprecise and vary across the devolved nations. Currently, the burden of responsibility falls on individual local authority planning officers who have no specific training or background in lithium-ion technology—and why on earth would they?
For reasons that are hard to understand—perhaps the Minister can explain—fire and rescue services have not been made statutory consultees for planning applications. The current guidance states that applicants are “encouraged to engage” rather than required to do so, but even compulsory consultation is not enough by itself because the fire services themselves do not always have the expertise. Within the last fortnight, Henry Griffin, Suffolk’s deputy chief fire officer asked for fire services to be given new powers, saying:
“I’d like to see a power that is akin to a regulatory order like those for a commercial property, where we would have the power to enforce safety measures on those sites.”
He explained that the fire service is currently just a “contributing partner”, able to give “direction and professional advice”, but not necessarily to require what it might like.
The result is inconsistency, which is destructive both of public trust and of the success of the industry. In my own constituency of Horsham, the local planning authority has rejected a BESS application, while a similar site, just half a mile away, across the border in Mid Sussex, has won approval. Such inconsistencies show alarming parallels with Grenfell. The Grenfell disaster was the end result of many failings by both individuals and companies, but at heart it was a failure of regulation. The rules left things wide open for exploitation by cost-cutting developers, which is exactly what happened. Just as with lithium-ion batteries, a new technology—in that case cladding—was being used at scale for the first time, without proper understanding of the risks. The time to act is now because the number of BESS applications is expanding exponentially.