Deep Space Advanced Radar Capability Pre-Application Consultation

As part of the Ministry of Defence’s (MOD's) proposal to construct a Deep Space Advanced Radar Capability (DARC) at Cawdor Barracks, the MOD is required to conduct a statutory pre-application consultation in accordance with the Planning (Wales) Act 2015.

Last fetched 03 May 2026 · gov.uk
Detail

As part of the MOD’s proposal to construct a Deep Space Advanced Radar Capability (DARC) at Cawdor Barracks, the MOD is required to conduct a statutory pre-application consultation in accordance with the Planning (Wales) Act 2015. The pre-application consultation period provides the opportunity for stakeholders and the wider community to review the proposal and submit feedback prior to the submission of the planning application.

Following the progression of the design process, the MOD has undertaken an Environmental Impact Assessment (EIA) with the support of independent subject matter experts. The EIA is a detailed study that evaluates the potential effects of the proposed development on the environment and ensures that environmental matters are fully considered in the planning process.

The MOD now offers these materials, including the findings of the EIA, for public review. The pre-application consultation period will run to 23 March 2026. Feedback can be submitted via email to darc@cascadecommunications.co.uk.

What Happens Next?

The MOD will review all feedback received from stakeholders and the community as it is received. This feedback will be considered alongside the findings of the EIA and other technical studies to refine the proposal, where appropriate.

Once this process is complete, the MOD intends to submit a formal planning application to the Pembrokeshire County Council. The planning application will include all supporting documentation, including a summary of the feedback received during the consultation and how it has been addressed. 

For further information about the proposal or the consultation process, please contact darc@cascadecommunications.co.uk.

Ymgynghoriad Cyn Ymgeisio Galluogrwydd Radar Uwch y Gofod Pell

Fel rhan o gynnig y Weinyddiaeth Amddiffyn i adeiladu Galluogrwydd Radar Uwch y Gofod Pell (DARC) ym Marics Cawdor, mae’n ofynnol i’r Weinyddiaeth Amddiffyn gynnal ymgynghoriad statudol cyn ymgeisio yn unol â Deddf Cynllunio (Cymru) 2015. Mae’r cyfnod ymgynghori cyn ymgeisio yn rhoi cyfle i randdeiliaid a’r gymuned ehangach adolygu’r cynnig a chyflwyno adborth cyn cyflwyno’r cais cynllunio.

Yn dilyn cynnydd y broses ddylunio, mae’r Weinyddiaeth Amddiffyn wedi cynnal Asesiad o’r Effaith Amgylcheddol gyda chymorth arbenigwyr pwnc annibynnol. Mae’r Asesiad o’r Effaith Amgylcheddol yn astudiaeth fanwl sy’n gwerthuso effeithiau posibl y datblygiad arfaethedig ar yr amgylchedd ac yn sicrhau bod materion amgylcheddol yn cael eu hystyried yn llawn yn y broses gynllunio.

Mae’r Weinyddiaeth Amddiffyn bellach yn cynnig y deunyddiau hyn, gan gynnwys canfyddiadau’r Asesiad o’r Effaith ar Gydraddoldeb, i’w hadolygu’n gyhoeddus. Bydd y cyfnod ymgynghori cyn ymgeisio yn rhedeg tan 23 Mawrth 2026. Gellir cyflwyno adborth drwy e-bost i darc@cascadecommunications.co.uk.

Beth sy’n digwydd nesaf?

Bydd y Weinyddiaeth Amddiffyn yn adolygu’r holl adborth a geir gan randdeiliaid a’r gymuned wrth iddo ddod i law. Bydd yr adborth hwn yn cael ei ystyried ochr yn ochr â chanfyddiadau’r Asesiad o’r Effaith Amgylcheddol ac astudiaethau technegol eraill i fireinio’r cynnig, lle bo hynny’n briodol.

Ar ôl cwblhau’r broses hon, mae’r Weinyddiaeth Amddiffyn yn bwriadu cyflwyno cais cynllunio ffurfiol i Gyngor Sir Penfro. Bydd y cais cynllunio yn cynnwys yr holl ddogfennau ategol, gan gynnwys crynodeb o’r adborth a gafwyd yn ystod yr ymgynghoriad a sut y rhoddwyd sylw iddo.

I gael rhagor o wybodaeth am y cynnig neu’r broses ymgynghori, cysylltwch â darc@cascadecommunications.co.uk.

Documents
DARC list of documentsApplication Form for PACapplication/pdfDraft Cover Letter application/pdfDARC - Document Schedule application/pdfDARC Drawing Schedule for PAC application/pdfPlanning Statement – PAC Draftapplication/pdfCawdor Barracks DAS application/pdfDARC - ICNIRP Declarationapplication/pdfDARC Green Infrastructure Statementapplication/pdfCawdor Barracks Pre-application Reportapplication/pdfSite Location Planapplication/pdfExisting Layoutapplication/pdfExisting Levelsapplication/pdfExisting Conditionsapplication/pdfExisting Section Viewsapplication/pdfOverall Site Plansapplication/pdfRX Antenna Array Site Planapplication/pdfSupport Facilities Site Planapplication/pdfTX antenna array site planapplication/pdfTemp Construction Access Planapplication/pdfFence Detailsapplication/pdfRADAR Operation Building (ROB) Plans and Elevationsapplication/pdfRADAR Spares Building (RSB) Plans and Elevationapplication/pdfNGED Connection Buildings (NCB) Plans and Elevationsapplication/pdfSwitchroom Building (SRB) Plans and Elevationsapplication/pdfEntry Control Point Building (ECPB) Plans and Elevationsapplication/pdfTransmit Cooling Building Plans and Elevationsapplication/pdfAntenna Integration Shelter (AIS) Plans and Elevationsapplication/pdfEnclosures Plans and Elevations (Electronic and Pump House)application/pdfEnclosures Plans and Elevations (Generators)application/pdfAntenna Elevationsapplication/pdfProposed Section Viewapplication/pdfLandscape and Ecology Proposals Planapplication/pdfDARC ES Volume 1 Non-Technical Summaryapplication/pdfDARC ES Volume 2 Chapter 1-4 Introductory Chaptersapplication/pdfDARC ES Volume 2 Chapter 5 - Transport and Accessapplication/pdfDARC ES Volume 2 Chapter 6 - Air Qualityapplication/pdfDARC ES Volume 2 Chapter 7 - Noise and Vibrationapplication/pdfDARC ES Volume 2 Chapter 8 - Biodiversityapplication/pdfDARC ES Volume 2 Chapter 9 - Landscape and Visualapplication/pdfDARC ES Volume 2 Chapter 10 - Archaeology and Built Heritageapplication/pdfDARC ES Volume 2 Chapter 11 - Ground Conditions and Contaminated Landapplication/pdfDARC ES Volume 2 Chapter 12 - Water Environment, Flood Risk and Drainageapplication/pdfDARC ES Volume 2 Chapter 13 - Socio Economicsapplication/pdfDARC ES Volume 2 Chapter 14 - Climate Change and Carbonapplication/pdfDARC ES Volume 2 Chapter 15 - Heat and Radiationapplication/pdfDARC ES Volume 2 Chapter 16 - Lightingapplication/pdfDARC ES Volume 2 Chapter 17 - Cumulative Effectsapplication/pdfDARC ES Volume 2 Chapter 18 - Schedule of Mitigationapplication/pdfDARC ES Volume 2 Chapter 19 - Summary of Significant Residual Effectsapplication/pdfDARC ES Volume 2 Chapter 20 - Glossaryapplication/pdfDARC ES Volume 3 Appendix 1.1-3.1application/pdfDARC ES Volume 3 Appendix 5.1-5.4application/pdfDARC ES Volume 3 Appendix 6.1-6.4application/pdfDARC ES Volume 3 Appendix 7.1-7.4application/pdfDARC ES Volume 3 Appendix 8.1-8.10application/pdfDARC ES Volume 3 Appendix 9.1-9.3application/pdfDARC ES Volume 3 Appendix 10.1-10.5application/pdfDARC ES Volume 3 Appendix 11.1-11.3application/pdfDARC ES Volume 3 Appendix 12.1-12.4application/pdfDARC ES Volume 3 Appendix 15.1-15.2application/pdfDARC ES Volume 3 Appendix 16.1-16.3application/pdfDARC ES Volume 3 Appendix 17.1application/pdfDARC ES Volume 4 Figures 1.1-4.1application/pdfDARC ES Volume 4 Figures 5.1-5.2application/pdfDARC ES Volume 4 Figures 6.1-6.3application/pdfDARC ES Volume 4 Figures 7.1-7.10application/pdfDARC ES Volume 4 Figures 8A-8Eapplication/pdfDARC ES Volume 4 Figures 9.1-9.5application/pdfDARC ES Volume 4 Figures 10.1-10.2application/pdfDARC ES Volume 4 Figures 12.1-12.5application/pdfDARC ES Volume 4 Figure 17.1application/pdfDARC ES Volume 5 Visualisationsapplication/pdf